Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Hebei Cangzhou Tianxiang Tile Press Co., Ltd.

Colored steel tile press, glazed tile press, corner tile press, floor load-be...

sell
  • There is no classification
contact
  • Contact:孙建新
  • Phone:15511762963
  • Email:2669897336@qq.com
  • fax:0317-8319318
search
 
link
  • There is no link yet
home > sell > 1100 tile press 1100 tile press introduction 1100 fully automatic tile press
1100 tile press 1100 tile press introduction 1100 fully automatic tile press
products: Views:101100 tile press 1100 tile press introduction 1100 fully automatic tile press 
brand: 沧州天翔
price: 25000.00元/台
MOQ: 1 台
Total supply: 100 台
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-08-25 22:43
 
Details
br/> 1. Introduction of tile press
Type of tile press
, equipment installation dimensions
, forming pass arrangement
, total equipment weight, approx., feeding plate thickness
, feed width
, main engine power, hydraulic shearing power
, hydraulic station pressure, electronic control system The whole machine adopts industrial computer control
, working speed/
. The material of the roll of the tile press is steel plated with hard chromium. The hardness
2. Installation of the tile press
Before erection, the person in charge of the unit project should follow the steel structure tile press mechanical assembly and disassembly plan. According to the requirements, a safety technical plan should be carried out for the erecting workers, and both parties should complete the signing procedures. When erecting the pole, two people should cooperate with each other. When the large and small crossbars are connected to the vertical pole, two people must also cooperate.
, Material preparation, inspection of steel pipes, fasteners, steel structure tile pressing machinery, safety nets, etc. entering the site.
, Shelf workers should hold valid species operator operating certificates to work. Seat belts must be worn and shoes must be worn. Plastic-soled shoes, leather shoes and other hard and slippery shoes are strictly prohibited for climbing operations. Operation tools and small parts should be placed in tool bags, and the cuffs, collars and trouser legs should be tied tightly to prevent danger from hooking.
. The accumulated errors in the mechanical erection of steel structures exceed the allowable deviation and are difficult to correct. After each step of the porter's scaffolding is completed, the step distance, longitudinal distance, horizontal distance, and verticality of the poles must be corrected according to regulations. . , Be familiar with drawings and construction site inspections, master the structural characteristics of building planes and facades, and environmental conditions, and determine steel structure tile pressing in accordance with the structural requirements in the "Safety Technical Specifications for Fastener-type Steel Pipe and Steel Structure Tile Pressure Machinery in Construction" () Mechanical step distance, etc., specific installation steps

Request for quotation
A total of0articles  Related Comments: